CPEC Infrastructure
No. | Project Name | Length (KM) | Estimated Cost(US$ M) |
---|---|---|---|
1 | KKH Phase II (Thakot -Havelian Section) | 118 | 1315 |
2 | Peshawar-Karachi Motorway (Multan-Sukkur Section) | 392 | 2889 |
3 | Khuzdar-Basima Road N-30 (110 km) | 110 | 19.19 Billion Rupee |
4 | Upgradation of D.I.Khan (Yarik) - Zhob, N-50 Phase-I (210 km) | 210 | 76 Billion Ruppe |
5 | KKH Thakot-Raikot N35 remaining portion (136 Km) | 136 | |
6 | Expansion and reconstruction of existing Line ML-1 | 1,830 | 6808 |
7 | Havelian Dry port (450 M. Twenty-Foot Equivalent Units) | 65 |