No. Project Name Mega Watt(MW) Estimated Cost(US$ M)
1 Sahiwal 2x660MW Coal-fired Power Plant, Punjab 1320 1912.2
2 2×660MW Coal-fired Power Plants at Port Qasim Karachi 1320 1912.2
3 HUBCO Coal Power Project, Hub Balochistan 1320 1912.2
4 Engro 2x330MW Thar Coal Power Project 660 995.4
5 Quaid-e-Azam 1000MW Solar Park (Bahawalpur) Quaid-e-Azam 1000 1301
6 Hydro China Dawood Wind Farm(Gharo, Thatta) 49.5 112.65
7 UEP Wind Farm (Jhimpir, Thatta) 99 250
8 Sachal Wind Farm (Jhimpir, Thatta) 49.5 134
9 Three Gorges Second and Third Wind Power Project 100 150
10 SSRL Thar Coal Block-I 6.8 mtpa & Power Plant(2×660MW) (Shanghai Electric) 1320 1912.12
11 HUBCO Thar Coal Power Project (Thar Energy) 330 497.7
12 Thal Nova Thar Coal Power Project 330 497.7
13 Karot Hydropower Station 720 1698.15
14 Suki Kinari Hydropower Station, Naran,Khyber Pukhtunkhwa 870 1707
15 Matiari to Lahore ±660kV HVDC Transmission Line Project 1658.34
16 300MW Imported Coal Based Power Project at Gwadar, Pakistan 300 542.32
17 Thar Mine Mouth Oracle Power Plant ( 1320MW) & surface mine 1320 Yet to be determined
CPEC-Energy Actively Promoted Projects
No. Project Name Mega Watt(MW) Estimated Cost(US$ M)
1 Kohala Hydel Project, AJK 1100 2364.05
2 Cacho 50MW Wind Power Project 50
3 Western Energy (Pvt.) Ltd. 50MW Wind Power Project 50
4 Azad Pattan Hydel Project, AJK 701 1650
CPEC-Potential Energy Projects
No. Project Name Mega Watt(MW)
1 Phandar Hydropower Station 80
2 Gilgit KIU Hydropower 100